|
Energy (6*)
|
| ELECTRICTY |
| |
Active |
Reactive |
Network connection |
On-Off |
| Production Electric |
Offical Industrial Tariff |
Offical Industrial Tariff |
Power x4 USD |
50 USD |
| Construction Electric |
Offical Industrial Tariff + %10 |
|
Power x4 USD |
50 USD |
| DEPOSIT |
(Power x 0,7 x 225 (Working
Hour) x Electricty Price x 0,5) |
|
| WATER |
| Installation |
On -Off |
Consumption (
purifying + sewage included ) |
0-20 m3 |
20 m3 over |
7,5 USD x Water Depot Capacity (m3) |
50 USD |
Production water |
25 USD
Fix |
1,25 USD / m3 |
| Costruction Water |
35 USD
Fix |
1,90 USD / m3 |
|
| NATURAL GAS |
| Connection and Control |
Depozit |
Price |
On-Off |
| 0-25 Nm3/h Capacity |
Over 25 Nm3/h Capacity |
| 2500 USD |
(Nm3/h -25) x 30 USD |
(Capacity(Nm3/h) x 225 (Working Hour) x Naturel
gas sales price) x 0.5
|
Cost + %10 |
50 USD |
|
|
Telecommunication
|
| TELEPHONE |
| :: |
Connection and Control |
Deposit |
Unit Price |
On-Off |
| EXTERNAL LINE |
180 USD / pc. |
300 USD |
Official Rate + %10 |
50 USD |
|
| ADSL (Internet) |
| Connection and Control |
Deposit |
Line rentel/Montly |
On-Off |
| 60 USD / pc. |
1 month official rentel fee(Official Rate) |
Official Rate + %10 |
50 USD |
|
| DATA LINES |
| Control and Connection |
Depozit |
Line rentel/Montly |
On- Off |
| Below128 Kbps and Speed |
Over 128 Kbps speed |
| Official Rate + 180 USD / pc. |
Official Rate + 360 USD / pc. |
1 month official rentel fee (Official Rate) |
Official Rate + %10 |
50 USD |
|
|
Technical Services
|
| PROJECT CONTROL |
0.75 USD / m2 |
| CONSTRUCTION CONTROL |
0.75 USD / m2 |
| Technical Services Ascertain Price (per unit work) |
30 USD / work |
|
|
General Service Fee (1*)
|
| Closed Area (
m2/mounth ) |
Closed Area (
m2/mounth ) |
| 0 - 119 |
120 - 479 |
480 - 959 |
960 - 1.999 |
2.000 - 4.999 |
5.000 - 9.999 |
10.000 - 14.999 |
15.000 and over |
| 45 $ |
60 $ |
90 $ |
0.12 $ |
0.09 $ |
0.08 $ |
0.07 $ |
0.06 $ |
|
|
Waste Container For Garbages
|
| AREA |
MINIMUM CONTAINER NUMBER |
| 0 - 2.500 m2 |
1 Container |
| 2.501 m2 - 5.000 m2 |
2 Container |
| 5.001 m2 - 10.000 m2 |
4 Container |
|
|
Loading and Unloading
|
Additional Services
|
| |
Without Palette |
With Palette |
| Loading ( 3*
) |
7 USD / Tone |
6 USD / Tone |
| Unloading ( 3*
) |
7 USD / Tone |
6 USD / Tone |
| Loading-Unloading (
4* ) |
With Palette Loading or Unloading List Price x (
%25 ) |
| Inhouse storage and arrangement |
Forklift Work 30 USD/Hour/Forklift |
| Additional Worker 12 USD/Hour/Worker
|
| Forklift Operator |
18 USD/Hour/Forklift Operator |
Vehicle Parking (7*)
Interior Vehicle Parking (Tır,Truck, Heavy Constructıon Equipment) ( 7* ) |
15 USD / Day |
| Exterior Vehicle Parking For TIR and Trucks ( 7* ) |
7 USD / Day |
Catering
| Breakfast |
2 USD |
| Meal 1 |
2,8 USD |
| Meal2 |
3,7 USD |
|
| Weightbridge cost ( 5* ) |
3.5 USD/Vehicle |
| Vehicle Enterance ( 5* ) |
3.5 USD/Vehicle |
| Vehicle enterance stampt (cars and service busses) |
18 USD /Year/Pc. |
| Vehicle enterance stampt (other vehicles) |
22 USD /Year/Pc. |
| Free Zone Operation Form |
3 USD / Pc. |
| Container and Machinery temporary enterance Form |
3 USD / Pc. |
|
- General Services; İncluding environment, cleaning, collecting garbage, general lightening, general expenses…etc.
- "INDUSTRIAL WASTES" ; special industrial wastes will be collected
according to special agreements seperately done by the users.
- - 5* If LOADING / UNLOADING is done after 17:00PM or at Saturdays,
Sundays and official holidays 5the users will pay 50% more over list
price The overtime requirements made after 18:00 the employees waiting
for the overtime working will be send at 20:00 if the work will not
be realised the compnay who requries for overtime working shall pay
100 USD waiting fee
- If the user company provides the services named “loading-unloading services” by its own staff by the approve of EFZ or provides it from a proffessional 3 rd party or it is transit goods, 25% of the “loading – unloadin services with palette” tarif is collected as coordination fee.
- Every commercial vehicle will be weighed while going in and out of
free zone.
- Transmission loss ratio shall be added on monthly consumption amount
- Will be taken from vehicles (except automobiles) parking between 22:00-05:00 hours inside or outside of Europen Free Zone.
- Note 1: Companies who haven't done insurance cannot blame EFZ
form the damages which may occur during the loading/unloading work
- Note 2: The services which are not indicated in price list
will be invoiced as cost+10%
- Note 3: EFZ can stop giving services to the users who do not
pay service fees.
- Note 4: The above mentioned services can be given only if the
infrastructure is suitable.
|