Service Price List of Year 2008Yazdır

Energy (6*)

ELECTRICTY
  Active Reactive Network connection On-Off
Production Electric Offical Industrial Tariff Offical Industrial Tariff Power x4 USD 50 USD
Construction Electric Offical Industrial Tariff + %10   Power x4 USD 50 USD
DEPOSIT (Power x 0,7 x 225 (Working Hour) x Electricty Price x 0,5)
WATER
Installation On -Off Consumption ( purifying + sewage included ) 0-20 m3 20 m3 over
7,5 USD x Water Depot
Capacity (m3)
50 USD Production water 25 USD Fix 1,25 USD / m3
Costruction Water 35 USD Fix 1,90 USD / m3
NATURAL GAS
Connection and Control Depozit Price On-Off
0-25 Nm3/h Capacity Over 25 Nm3/h Capacity
2500 USD (Nm3/h -25) x 30 USD (Capacity(Nm3/h) x 225 (Working Hour) x Naturel gas sales price) x 0.5
Cost + %10 50 USD

Telecommunication

TELEPHONE
:: Connection and Control Deposit Unit Price On-Off
EXTERNAL LINE 180 USD / pc. 300 USD Official Rate + %10 50 USD
ADSL (Internet)
Connection and Control Deposit Line rentel/Montly On-Off
60 USD / pc. 1 month official rentel fee(Official Rate) Official Rate + %10 50 USD
DATA LINES
Control and Connection Depozit Line rentel/Montly On- Off
Below128 Kbps and Speed Over 128 Kbps speed
Official Rate + 180 USD / pc. Official Rate + 360 USD / pc. 1 month official rentel fee (Official Rate) Official Rate + %10 50 USD

Technical Services

PROJECT CONTROL 0.75 USD / m2
CONSTRUCTION CONTROL 0.75 USD / m2
Technical Services Ascertain Price (per unit work) 30 USD / work

General Service Fee (1*)

Closed Area ( m2/mounth ) Closed Area ( m2/mounth )
0 - 119 120 - 479 480 - 959 960 - 1.999 2.000 - 4.999 5.000 - 9.999 10.000 - 14.999 15.000 and over
45 $ 60 $ 90 $ 0.12 $ 0.09 $ 0.08 $ 0.07 $ 0.06 $

Waste Container For Garbages

AREA MINIMUM CONTAINER NUMBER
0 - 2.500 m2 1 Container
2.501 m2 - 5.000 m2 2 Container
5.001 m2 - 10.000 m2 4 Container

Loading and Unloading

Additional Services

  Without Palette With Palette
Loading ( 3* ) 7 USD / Tone 6 USD / Tone
Unloading ( 3* ) 7 USD / Tone 6 USD / Tone
Loading-Unloading ( 4* ) With Palette Loading or Unloading
List Price
x ( %25 )
Inhouse storage and arrangement Forklift Work 30 USD/Hour/Forklift
Additional Worker 12 USD/Hour/Worker
Forklift Operator 18 USD/Hour/Forklift Operator


Vehicle Parking (7*)

Interior Vehicle Parking
(Tır,Truck, Heavy Constructıon Equipment) ( 7* )
15 USD / Day
Exterior Vehicle Parking For TIR and Trucks ( 7* ) 7 USD / Day


Catering

Breakfast 2 USD
Meal 1 2,8 USD
Meal2 3,7 USD
Weightbridge cost ( 5* ) 3.5 USD/Vehicle
Vehicle Enterance ( 5* ) 3.5 USD/Vehicle
Vehicle enterance stampt (cars and service busses) 18 USD /Year/Pc.
Vehicle enterance stampt (other vehicles) 22 USD /Year/Pc.
Free Zone Operation Form 3 USD / Pc.
Container and Machinery temporary enterance Form 3 USD / Pc.

  1. General Services; İncluding environment, cleaning, collecting garbage, general lightening, general expenses…etc.
  2. "INDUSTRIAL WASTES" ; special industrial wastes will be collected according to special agreements seperately done by the users.
  3. - 5* If LOADING / UNLOADING is done after 17:00PM or at Saturdays, Sundays and official holidays 5the users will pay 50% more over list price The overtime requirements made after 18:00 the employees waiting for the overtime working will be send at 20:00 if the work will not be realised the compnay who requries for overtime working shall pay 100 USD waiting fee
  4. If the user company provides the services named “loading-unloading services” by its own staff by the approve of EFZ or provides it from a proffessional 3 rd party or it is transit goods, 25% of the “loading – unloadin services with palette” tarif is collected as coordination fee.
  5. Every commercial vehicle will be weighed while going in and out of free zone.
  6. Transmission loss ratio shall be added on monthly consumption amount
  7. Will be taken from vehicles (except automobiles) parking between 22:00-05:00 hours inside or outside of Europen Free Zone.
  • Note 1: Companies who haven't done insurance cannot blame EFZ form the damages which may occur during the loading/unloading work
  • Note 2: The services which are not indicated in price list will be invoiced as cost+10%
  • Note 3: EFZ can stop giving services to the users who do not pay service fees.
  • Note 4: The above mentioned services can be given only if the infrastructure is suitable.